ACTIVITY | DAILY REPORTS | DTW | Pappu DTW – 111 LIT Maintenance Work Complete. Posted onNovember 1, 2022November 1, 2022 Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷
ACTIVITY | DAILY REPORTS | MOV | Pappu OGR booster pump F MOV limit switch adjustment complete. Posted onOctober 16, 2022October 16, 2022 Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the mov. In this case the valve is…
ACTIVITY | DAILY REPORTS | Parvez | REPORTS OGR Booster room dewatering pump run command showing problem at low level Posted onDecember 6, 2022December 6, 2022 Float switch reconnection and rearrange. Now normal
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez Dtw-122 serial Comm.New UTP Cable installing complete. Posted onSeptember 28, 2022September 28, 2022 Problem: : Modbus com interrupt problem.Problem found:The serial communication cable was cut by rat 🐁. then UTP Cable installing . new pump is…
DAILY REPORTS | REPORTS MOV REPORT 2022 Posted onNovember 3, 2022December 11, 2022 MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…
ACTIVITY | CCTV | DAILY REPORTS | DTW | Jewel | NETWORK CONNECTIVITY | Pappu | Parvez | REPORTS Optical Fiber Maintenance Posted onNovember 21, 2022November 22, 2022 Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…