ACTIVITY PWID27:DTW204 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez 4 nos Monitoring Well Level Sensor Installation Complete. Posted onSeptember 21, 2022September 21, 2022 1 :MW03B 2: MW14A 3:MW08A 4: MW13B
ACTIVITY PWID46:DTW101 to 106 TJ Box sealing with silicon glue. Posted onNovember 16, 2023November 16, 2023
ACTIVITY DTW-218 UPS Output Voltage Showing High. Posted onDecember 2, 2023December 2, 2023 New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.
ACTIVITY PWID4:DTW104 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez DTW115 SCADA PACK INSTALL COMPLETE Posted onSeptember 8, 2022September 9, 2022