Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,









Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,









IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…
1.VFD Controller Damage 2. Emergency Switch control Open circuit Fault Found. Now we change a VFD Controller and Maintenance the control circuit Now…
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
Fiber Optical Maintenance Near DTW-103
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
IRP-2 Sub-Station 1Nos New Server Rack Installation Done