Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • 1051 Resistance Decade Box
    Product Specifications

    1051 Resistance Decade Box

    Posted onDecember 4, 2022December 4, 2022

    Specifications Sl No Brand Time Electronics, Country of Origin UK Range 0 to 1 MΩ Resolution 0.01 Ω steps Decade 0.01 Ω Accuracy…

    Listen to the Message 1051 Resistance Decade BoxContinue

  • ScadaPack transfer from DTW-207 to 202
    ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    ScadaPack transfer from DTW-207 to 202

    Posted onDecember 3, 2022December 3, 2022

    ScadaPack transfer from DTW-207 to 202 Done

    Listen to the Message ScadaPack transfer from DTW-207 to 202Continue

  • Unused LIT Collect from DTW- 221,207,120,123
    ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    Unused LIT Collect from DTW- 221,207,120,123

    Posted onDecember 3, 2022December 3, 2022

    Unused LIT Collect from DTW- 221,207,120,123 Done

    Listen to the Message Unused LIT Collect from DTW- 221,207,120,123Continue

  • IRP-1 CCTV monitor HDMI cable plug & power up
    ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS

    IRP-1 CCTV monitor HDMI cable plug & power up

    Posted onDecember 3, 2022December 3, 2022

    IRP-1 CCTV monitor HDMI cable plug & power up Done

    Listen to the Message IRP-1 CCTV monitor HDMI cable plug & power upContinue

  • Dtw-113 integration with SCADA by Optical Fiber
    ACTIVITY | DAILY REPORTS | Parvez | REPORTS

    Dtw-113 integration with SCADA by Optical Fiber

    Posted onDecember 1, 2022December 1, 2022

    Listen to the Message Dtw-113 integration with SCADA by Optical FiberContinue

  • Breaker installation for SCADA control Room Monitor.
    ACTIVITY | DAILY REPORTS | Parvez | REPORTS

    Breaker installation for SCADA control Room Monitor.

    Posted onDecember 1, 2022December 1, 2022

    Breaker installation for SCADA control Room Monitor Done

    Listen to the Message Breaker installation for SCADA control Room Monitor.Continue

  • DTW-219 & 220 Cleaning
    ACTIVITY | DAILY REPORTS | Parvez | REPORTS

    DTW-219 & 220 Cleaning

    Posted onDecember 1, 2022December 1, 2022

    Dtw-220 & 219 RTU, VFD & CCTV Panel all equipment cleaning

    Listen to the Message DTW-219 & 220 CleaningContinue

  • IRP-2 Sand Filter All Ultrasonic Sensor Cleaning
    ACTIVITY | DAILY REPORTS | Jewel | Parvez | REPORTS

    IRP-2 Sand Filter All Ultrasonic Sensor Cleaning

    Posted onDecember 1, 2022December 1, 2022

    IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.

    Listen to the Message IRP-2 Sand Filter All Ultrasonic Sensor CleaningContinue

  • ACTIVITY | DAILY REPORTS | Parvez | REPORTS

    IRP-1 All sandfilter ultrasonic sensor cleaning

    Posted onNovember 29, 2022November 29, 2022

    IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust

    Listen to the Message IRP-1 All sandfilter ultrasonic sensor cleaningContinue

  • ACTIVITY | DAILY REPORTS | Parvez | REPORTS

    IRP-1 All Doom Camera Lens & Camera Panel Cleaning

    Posted onNovember 29, 2022November 29, 2022

    IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust

    Listen to the Message IRP-1 All Doom Camera Lens & Camera Panel CleaningContinue

Page navigation

Previous PagePrevious 1 … 19 20 21 22 23 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers