IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
Previous control cable is damaged by ant .so we replace new control cable
Previous control cable is damaged by ant .so we replace new control cable
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
IRP-1. CC Camera Server Panel Cleaning Done
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
DTW-104,105,106,107 Cleaning Done
SL. No Item Name Unit Qty. Remarks 1 Magnetic Contactor Nos 3 2 Float Switch Nos 2 3 OGR Supply Fan Motor Nos…
The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…