  • IRP-2 Server Rak Installation
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    IRP-2 Server Rak Installation

    Posted onNovember 16, 2022November 16, 2022

    IRP-2 Sub-Station 1Nos New Server Rack Installation Done

    Listen to the Message IRP-2 Server Rak InstallationContinue

  • DTW-104,105,106,107 CLEANING WORK
    ACTIVITY | DAILY REPORTS | DTW | Jewel | Pappu | Parvez | REPORTS

    DTW-104,105,106,107 CLEANING WORK

    Posted onNovember 15, 2022November 15, 2022

    DTW-104,105,106,107 Cleaning Done

    Listen to the Message DTW-104,105,106,107 CLEANING WORKContinue

  • Uncategorized

    Demand for Goods

    Posted onNovember 15, 2022November 28, 2022

    SL. No Item Name Unit Qty. Remarks 1 Magnetic Contactor Nos 3 2 Float Switch Nos 2 3 OGR Supply Fan Motor Nos…

    Listen to the Message Demand for GoodsContinue

  • Uncategorized

    Chlorine Weighing Scale Callibration

    Posted onNovember 15, 2022November 15, 2022

    Listen to the Message Chlorine Weighing Scale CallibrationContinue

  • ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    DTW-109 Radio Communication Check

    Posted onNovember 14, 2022November 14, 2022

    The signal strength so week and we can’t develope the signal strength changing in Multiple direction. there is not clear line of sight…

    Listen to the Message DTW-109 Radio Communication CheckContinue

  • ACTIVITY | DAILY REPORTS | DTW | Pappu | REPORTS

    DTW- 120 LIT And PIT Maintenance

    Posted onNovember 14, 2022November 14, 2022

    DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…

    Listen to the Message DTW- 120 LIT And PIT MaintenanceContinue

  • ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

    OPTICAL FIBER MAINTENANCE AT DTW-104

    Posted onNovember 14, 2022November 14, 2022

    In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…

    Listen to the Message OPTICAL FIBER MAINTENANCE AT DTW-104Continue

  • ACTIVITY | DAILY REPORTS | DTW | Jewel | Parvez | REPORTS

    DTW-202 NEW LIT INSTALLATION

    Posted onNovember 14, 2022November 14, 2022

    There was a damaged LIT. After regeneration work we have install a new LIT

    Listen to the Message DTW-202 NEW LIT INSTALLATIONContinue

  • CCTV

    CCTV Camera IP Address With Status 2022

    Posted onNovember 14, 2022December 11, 2022

    NAV-1 SL. No IP LOCATION Status Remarks 1 192.168.0.101 DTW-101 (NAV/1) DOME ✅OK 2 192.168.0.102 DTW101 (NAV/1) BULLET ✅OK 3 192.168.0.103 DTW101 (NAV/1)…

    Listen to the Message CCTV Camera IP Address With Status 2022Continue

  • Civil Construction Dust Create Massive Vulnerabilities
    Uncategorized

    Civil Construction Dust Create Massive Vulnerabilities

    Posted onNovember 13, 2022November 13, 2022

    যে সমস্ত DTW তে সিভিল কাজের জন্য পাম্প হাউজের ভিতরে সিমেন্ট বা অন্যান্য মালামাল রাখা হয় , সেই সমস্ত DTW এর ডিভাইসে সবচেয়ে…

    Listen to the Message Civil Construction Dust Create Massive VulnerabilitiesContinue

Page navigation

Previous PagePrevious 1 … 22 23 24 25 26 … 196 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers