    IRP-1 All DTW NEV Voltage Report

    Posted onJuly 4, 2022July 5, 2022

    NEV voltage [Report] SL No. Location Voltage Comments 01. DTW-101 37mV 02. DTW-102 170mV 03. DTW-103 231mV 04. DTW-104 1.1V 05. DTW-105 42mV…

    Listen to the Message IRP-1 All DTW NEV Voltage ReportContinue

  • REPORTS

    DTW UVR, ELD, GiMAC , ACB & LV Panel P/M of Month [Report]

    Posted onJuly 4, 2022July 5, 2022

    SL No. DTW No UVR ELD GiMAC ACB Comments 01. 101 02. 102 03. 103 04. 104 05. 105 06. 106 07. 107…

    Listen to the Message DTW UVR, ELD, GiMAC , ACB & LV Panel P/M of Month [Report]Continue

  • Uncategorized

    IRP-1 & 2 Sand Filter bed & Backwash all LIT sensor cleaning[Report]

    Posted onJuly 4, 2022July 4, 2022

    SL No LIT Tag Status Comments 01. 1SF-A OK 02. 1SF-B OK 03. 1SF-C OK 04. 1SF-D OK 05. 1SF-E OK This sensor…

    Listen to the Message IRP-1 & 2 Sand Filter bed & Backwash all LIT sensor cleaning[Report]Continue

  • UVR, ELD, GiMAC , ACB & LV Panel PM work at DTW-114, 115, 118, 119
    Uncategorized

    UVR, ELD, GiMAC , ACB & LV Panel PM work at DTW-114, 115, 118, 119

    Posted onJuly 4, 2022July 4, 2022

    9

    Listen to the Message UVR, ELD, GiMAC , ACB & LV Panel PM work at DTW-114, 115, 118, 119Continue

  • Uncategorized

    2 Nos DTW -115,119 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning , checking & preventive maintenance work complete.

    Posted onJuly 3, 2022July 3, 2022

    Listen to the Message 2 Nos DTW -115,119 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning , checking & preventive maintenance work complete.Continue

  • IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.
    Uncategorized

    IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.

    Posted onJuly 3, 2022July 3, 2022

    Cleaning Completed.

    Listen to the Message IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.Continue

  • Uncategorized

    Protected: Daily Evaluation Report

    Posted onJuly 3, 2022July 4, 2022

    There is no excerpt because this is a protected post.

    Listen to the Message Protected: Daily Evaluation ReportContinue

  • Uncategorized

    IRP-1 Sandfilter Bluer’s VFD (2MO1A & 2MO1B) cleaning, checking and maintenance complete

    Posted onJune 30, 2022July 7, 2022

    Listen to the Message IRP-1 Sandfilter Bluer’s VFD (2MO1A & 2MO1B) cleaning, checking and maintenance completeContinue

  • Uncategorized

    OGR Booster pump A,B,C VFD cleaning, checking & maintenance work complete.

    Posted onJune 30, 2022July 7, 2022

    Listen to the Message OGR Booster pump A,B,C VFD cleaning, checking & maintenance work complete.Continue

  • IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
    Uncategorized

    IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.

    Posted onJune 30, 2022June 30, 2022

    RTU Panel cleaning completed.

    Listen to the Message IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.Continue

Page navigation

Previous PagePrevious 1 … 52 53 54 55 56 … 60 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers