Skip to content
TEAM ICE
  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
Uncategorized

IRP-1 Sandfilter Bluer’s VFD (2MO1A & 2MO1B) cleaning, checking and maintenance complete

Posted onJune 30, 2022July 7, 2022

Listen to the Message IRP-1 Sandfilter Bluer’s VFD (2MO1A & 2MO1B) cleaning, checking and maintenance completeContinue

Uncategorized

OGR Booster pump A,B,C VFD cleaning, checking & maintenance work complete.

Posted onJune 30, 2022July 7, 2022

Listen to the Message OGR Booster pump A,B,C VFD cleaning, checking & maintenance work complete.Continue

IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
Uncategorized

IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.

Posted onJune 30, 2022June 30, 2022

RTU Panel cleaning completed.

Listen to the Message IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.Continue

IRP-1 Electrical Room RTU Panel  Preventive Maintenance.
Uncategorized

IRP-1 Electrical Room RTU Panel Preventive Maintenance.

Posted onJune 30, 2022

Listen to the Message IRP-1 Electrical Room RTU Panel Preventive Maintenance.Continue

IRP-2 Dome Camera and Panel preventive maintenance.
Uncategorized

IRP-2 Dome Camera and Panel preventive maintenance.

Posted onJune 30, 2022June 30, 2022

All Dome camera front side and panel cleaning completed. Issues Inside Panel water existence found after raining.

Listen to the Message IRP-2 Dome Camera and Panel preventive maintenance.Continue

UVR & ELD monthly cleaning
Uncategorized

UVR & ELD monthly cleaning

Posted onJune 29, 2022July 4, 2022

In all DTW, there have lot of essential electronic devices that protect & control our system. UVR & ELD are playing a important…

Listen to the Message UVR & ELD monthly cleaningContinue

Uncategorized

3 Nos DTW -107,117,109 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning & checking complete.

Posted onJune 29, 2022July 5, 2022

Listen to the Message 3 Nos DTW -107,117,109 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning & checking complete.Continue

G4S MIS
Uncategorized

G4S MIS

Posted onJune 29, 2022July 17, 2022

Listen to the Message G4S MISContinue

IRP-2 SCADA Room RTU and Server Panel Preventive Maintenance.
Uncategorized

IRP-2 SCADA Room RTU and Server Panel Preventive Maintenance.

Posted onJune 29, 2022June 29, 2022

All panel cleaning completed.

Listen to the Message IRP-2 SCADA Room RTU and Server Panel Preventive Maintenance.Continue

IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)
Uncategorized

IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)

Posted onJune 29, 2022July 4, 2022

DTW – 107, 109, 119 CCTV panel cleaning completed. DTW 115, 118 DTW 114, 118

Listen to the Message IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)Continue

Page navigation

Previous PagePrevious 1 … 52 53 54 55 56 … 59 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2025 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers