ACTIVITY | DTW | Jewel | Pappu | Parvez CCTV camera maintenance & optical fiber rearrangement at DTW-117 Posted onOctober 6, 2022October 6, 2022 In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…
ACTIVITY PWID2:DTW102 Bullet camera glass and cage Cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | CCTV CCTV Maintenance At DTW-119 Posted onOctober 19, 2022December 11, 2022 1.1 Nos New Camera Installation . 2. connector change 3. IP Setup
ACTIVITY PWID16:DTW116 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | Pending Issue IRP-1 to IRP-2 SCADA controlling communication antenna Arrangement work complete. Posted onSeptember 29, 2022October 12, 2022
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez IRP-1 backwash holding tank (2P01A) pump Checking & Problem Found. Posted onSeptember 10, 2022September 10, 2022 problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…