ACTIVITY | Jewel | Pappu | Parvez Material inspection of SCADA Panel room Wall Mounted display. Posted onSeptember 12, 2022September 13, 2022
ACTIVITY PWID15:DTW115 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | DTW | Pappu | Parvez | REPORTS IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change Posted onNovember 20, 2022November 20, 2022 Previous control cable is damaged by ant .so we replace new control cable
ACTIVITY | CCTV CCTV Maintenance At DTW-107 Posted onOctober 17, 2022December 11, 2022 1. connector change 2. IP Setup
ACTIVITY PWID11:DTW111 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | CCTV | DTW | Jewel | Parvez | Uncategorized CCTV maintenance at DTW-109 Posted onOctober 6, 2022October 6, 2022 In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….