Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.






Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.






IRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
Problem: after power up time ACB do not close from the SCADA command.Problem found: DTW 114 UVR its burn inside circuit . UVR…
Observation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…
Brand Name: WEIDMULLER Product Name: Power supply Model No/Part No: PRO ECO 120W 24V 5A SPECIFICATION OF WEIDMULLER POWER SUPPLY SL NO….
MOV Report 2022 November IRP1 SL NO MOV ID Status Remarks 1 2V03A ✅OK 2 2V03B ✅OK 3 2V03C ✅OK 4 2V03D ✅OK…