ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez | REPORTS IRP-1 SDB Additional Dewatering Pump Fault check Posted onDecember 6, 2022December 6, 2022 IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…
ACTIVITY | DAILY REPORTS | Parvez | REPORTS Breaker installation for SCADA control Room Monitor. Posted onDecember 1, 2022December 1, 2022 Breaker installation for SCADA control Room Monitor Done
ACTIVITY PWID32:DTW209 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DAILY REPORTS | Jewel | Pappu | Parvez New parameter setting on an old ultrasonic level transmitter. Posted onSeptember 28, 2022September 28, 2022
ACTIVITY | Jewel | Pappu | Parvez Material inspection of SCADA Panel room Wall Mounted display. Posted onSeptember 12, 2022September 13, 2022
ACTIVITY | DAILY REPORTS | Pappu DTW210 to DTW213 Optical Fiber Maintenance Work Posted onAugust 25, 2022August 25, 2022