DTW-205 1Nos New PIT Installation Done
DTW-211 1Nos New PIT Installation Done
DTW-104 1Nos Old PIT Installation Done









DTW-205 1Nos New PIT Installation Done
DTW-211 1Nos New PIT Installation Done
DTW-104 1Nos Old PIT Installation Done









1.UTP Cable Change 2.Connector Change 3.IP Setup
SL No. DTW No UVR ELD GiMAC ACB Comments 01. 101 02. 102 03. 103 04. 104 05. 105 06. 106 07. 107…
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
1.DTW-103 New VFD Controller Install 2. Parameter set 3.Serial Communication Cable Wiring Work Done