IRP-2 Dome Camera and Panel preventive maintenance.
Posted onAll Dome camera front side and panel cleaning completed. Issues Inside Panel water existence found after raining.
WID600: IRP-1 & IRP-2 GCP & PLC Communication check list
Posted onSL No. DTW No. Serial Comm. Condition Generator Battery Cable Remarks 01 101 Okay Okay Okay 02 102 Okay Okay Okay …
WID627: IRP#1 SDB Pump ‘A’ sensor is not working. Need to check.
Posted onস্লাজ ড্রায়িং বেডের পানি, পাম্প চেম্বারের লেভেল পূর্ণ করতে সময় বেশি নেয়।
Preventive work schedule Nov-2023 (Kazi Jewel)
Posted onSL. No. Date WID: TaskDescription Location Manpower Remarks 01 1 November WID1: DTW-207 Optical Fiber maintenance. DTW-206 & 207 Kazi Jewel-HRasel Mizi-HGias Uddin-H…