Similar Posts
WID558: DTW123 ELD installation and Leakage current check.
Posted onFindings : ELD fuse burns when main UPS take input power. Action taken: 1. UPS replace but problem isn’t solved. 2. ELD replace…
Preventive working schedule-Nov2023( Md. Parvas)
Posted onSL. No. Date WID: TaskDescription Location Manpower Remarks 2 November PWID60: DTW-101 RTU, LIT, PIT, FIT clean check & maintenance. DTW-101 Parvas-AT Ahsanullah-Ele…
Yokogawa EXAxt450 Contacting Conductivity Analyzer
Posted onFeatures The model SC450 is designed to measure specific conductivity with contacting electrodes. This method is proven to offer very high measurement accuracy…
WID626: IRP-1 & IRP-2 area DTW’s total 20 Nos Bullet camera aren’t working.
Posted onDtw-201: UTP cable core interchange.Dtw-205: 1 nos new camera installation & 7M UTP cable use.Dtw-207: 1 nos new camera install.UTP cable core interchange.Dtw-209:…
WID:552 IRP2 Sandfilter MOV-3V05 fault showing problem check.
Posted onFindings: The relay always stay energize getting power from Digital Output I/O card. So sandfilter can’t maintain the backwash sequence. That’s why ,…
PWTP PLC Cabinet
Posted onSL. No Name/Brand Model Location Type Remarks 01 Mid-range PAC industrial process and infrastructure control “All-in-one CPU”7 Kinst/msMultitasking system for guaranteed reflex timeUSB…