Switch Gear Panel Arrangement Drawing Handover to Mr. Pappu(Assistant Shift Operator) and Mr. Parvez(Automation Technician) today (30.05.2022) at 1.43PM.
Switch Gear Panel Arrangement Drawing Handover to Mr. Pappu(Assistant Shift Operator) and Mr. Parvez(Automation Technician) today (30.05.2022) at 1.43PM.
1 KVA Online UPS (C Series)
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…