Booster Pump (F) Motor Bearing Temperature Mismatch Between field and SCADA


Booster Pump (F) Motor Bearing Temperature Mismatch Between field and SCADA


Switch Gear Panel Arrangement Drawing Handover to Mr. Pappu(Assistant Shift Operator) and Mr. Parvez(Automation Technician) today (30.05.2022) at 1.43PM.
MD. PARVAS AUTOMATION TECHNICIAN Monthly Preventive Maintenance Task
Introduction Supervisory Control and Data Acquisition (SCADA) serves as the backbone for digitalizing water management systems, playing a crucial role in achieving the…
SL NO DTW NO START DATE END DATE REMARKS 1 DTW-104 NO DATA 2 DTW-105 08.09.2022 STILL NOW 3 DTW-106 19.08.2022 05.09.2022 4…