    Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )

    Posted onJuly 5, 2022July 5, 2022

    SL No. DTW No Cleaning POE Switch ONU UPS 01. 101 Completed OK OK Problem 02. 102 Completed OK OK Problem 03. 103…

    Listen to the Message Report: IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance. ( June-July,2022 )Continue

  • Uncategorized

    APP FOR 2022-23

    Posted onJuly 5, 2022July 24, 2022

    APP for Fiscal Year 2022-23 সাভার কেরানীগঞ্জ ওয়েল ফিল্ড প্ল্যান্ট, ঢাকা ওয়াসার অত্যন্ত গুরুতপূর্ন ও মডেল পানি শোধনাগার। প্ল্যান্টটি সম্পুর্ন অটোমেটেড এবং স্ক্যাডা…

    Listen to the Message APP FOR 2022-23Continue

  • Uncategorized

    IRP-1 DTW (101 to123) VFD & VFD CONTROLLER REPORT.

    Posted onJuly 5, 2022July 5, 2022

    DTW VFD VFD CONTROLLER COMMENTS 101 OK OK 102 OK OK 103 OK NOT OK 104 OK OK 105 OK OK 106 OK…

    Listen to the Message IRP-1 DTW (101 to123) VFD & VFD CONTROLLER REPORT.Continue

  • Uncategorized

    2 Nos DTW -114,118 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning , checking & preventive maintenance work complete.

    Posted onJuly 5, 2022

    Listen to the Message 2 Nos DTW -114,118 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning , checking & preventive maintenance work complete.Continue

  • REPORTS

    IRP-1 All DTW NEV Voltage Report

    Posted onJuly 4, 2022July 5, 2022

    NEV voltage [Report] SL No. Location Voltage Comments 01. DTW-101 37mV 02. DTW-102 170mV 03. DTW-103 231mV 04. DTW-104 1.1V 05. DTW-105 42mV…

    Listen to the Message IRP-1 All DTW NEV Voltage ReportContinue

  • REPORTS

    DTW UVR, ELD, GiMAC , ACB & LV Panel P/M of Month [Report]

    Posted onJuly 4, 2022July 5, 2022

    SL No. DTW No UVR ELD GiMAC ACB Comments 01. 101 02. 102 03. 103 04. 104 05. 105 06. 106 07. 107…

    Listen to the Message DTW UVR, ELD, GiMAC , ACB & LV Panel P/M of Month [Report]Continue

  • Uncategorized

    IRP-1 & 2 Sand Filter bed & Backwash all LIT sensor cleaning[Report]

    Posted onJuly 4, 2022July 4, 2022

    SL No LIT Tag Status Comments 01. 1SF-A OK 02. 1SF-B OK 03. 1SF-C OK 04. 1SF-D OK 05. 1SF-E OK This sensor…

    Listen to the Message IRP-1 & 2 Sand Filter bed & Backwash all LIT sensor cleaning[Report]Continue

  • Uncategorized

    UVR, ELD, GiMAC , ACB & LV Panel PM work at DTW-114, 115, 118, 119

    Posted onJuly 4, 2022July 4, 2022

    9

    Listen to the Message UVR, ELD, GiMAC , ACB & LV Panel PM work at DTW-114, 115, 118, 119Continue

  • Uncategorized

    2 Nos DTW -115,119 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning , checking & preventive maintenance work complete.

    Posted onJuly 3, 2022July 3, 2022

    Listen to the Message 2 Nos DTW -115,119 VFD internal &VFD panel , RTU panel , SCADApack , Treo jr cleaning , checking & preventive maintenance work complete.Continue

  • Uncategorized

    IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.

    Posted onJuly 3, 2022July 3, 2022

    Cleaning Completed.

    Listen to the Message IRP-2 Sub-station CCTV Server Panel Preventive Maintenance.Continue

Page navigation

Previous PagePrevious 1 … 49 50 51 52 53 … 57 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers