Skip to content

TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers
TEAM ICE
  • Uncategorized

    IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)

    Posted onJune 29, 2022July 4, 2022

    DTW – 107, 109, 119 CCTV panel cleaning completed. DTW 115, 118 DTW 114, 118

    Listen to the Message IRP-1 all DTW CCTV Panel equipment inspection and preventive maintenance.(June-July,2022)Continue

  • Uncategorized

    IRP 2 all FCP & LOP panel cleaning complete 28/06/2022.

    Posted onJune 29, 2022July 5, 2022

    Listen to the Message IRP 2 all FCP & LOP panel cleaning complete 28/06/2022.Continue

  • Uncategorized

    Bearing Sensor Problems Booster Pump F

    Posted onJune 29, 2022June 29, 2022

    Booster Pump (F) Motor Bearing Temperature Mismatch Between field and SCADA

    Listen to the Message Bearing Sensor Problems Booster Pump FContinue

  • Product Specifications

    HP ProDesk 400 G6 MT Core i5 9th Gen Micro Tower PC

    Posted onJune 29, 2022February 19, 2023

    Specification Price: ৳ 49,500 Ref: HP ProDesk 400 G6 Microtower Business PC Specifications

    Listen to the Message HP ProDesk 400 G6 MT Core i5 9th Gen Micro Tower PCContinue

  • Uncategorized

    LIT sensor cleaning

    Posted onJune 29, 2022

    IRP-2 All ultrasonic type level sensor clean task complete.

    Listen to the Message LIT sensor cleaningContinue

  • Uncategorized

    Protected: SKWP WIFI USER DATA

    Posted onJune 27, 2022

    There is no excerpt because this is a protected post.

    Listen to the Message Protected: SKWP WIFI USER DATAContinue

  • Uncategorized

    VFD cleaning at OGR

    Posted onJune 27, 2022June 27, 2022

    IRP-1 OGR Booster pump (D,E,F) controlling Variable Frequency Drive internal circuit & components cleaning…..

    Listen to the Message VFD cleaning at OGRContinue

  • Uncategorized

    Protected: IRP-1 CCTV SERVER SYSTEM ARCHTECTURE

    Posted onJune 27, 2022June 27, 2022

    There is no excerpt because this is a protected post.

    Listen to the Message Protected: IRP-1 CCTV SERVER SYSTEM ARCHTECTUREContinue

  • Uncategorized

    Protected: ANSAR Personal Details

    Posted onJune 27, 2022July 7, 2022

    There is no excerpt because this is a protected post.

    Listen to the Message Protected: ANSAR Personal DetailsContinue

  • Uncategorized

    Monthly (Jun 22 -July 22) Task Plan for Parvez

    Posted onJune 27, 2022July 5, 2022

    MD. PARVAS AUTOMATION TECHNICIAN Monthly Preventive Maintenance Task

    Listen to the Message Monthly (Jun 22 -July 22) Task Plan for ParvezContinue

Page navigation

Previous PagePrevious 1 … 51 52 53 54 55 … 57 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers