    DTW-211,212,213,214,215 RTU and CCTV panel Cleaning

    Posted onDecember 4, 2023December 4, 2023

    Listen to the Message DTW-211,212,213,214,215 RTU and CCTV panel CleaningContinue

  • Uncategorized

    WID597: Dtw-101 PIT value isn’t shown in SCADA .

    Posted onDecember 4, 2023December 4, 2023

    Findings: PIT internal CKT damaged found. Action Taken: Install new pressure transmitter.

    Listen to the Message WID597: Dtw-101 PIT value isn’t shown in SCADA .Continue

  • Uncategorized

    WID599: DTW-121 serial communication problem. Need to check.

    Posted onDecember 4, 2023December 4, 2023

    Findings: 1. Always PWP panel inverter fault is showing. 2. Magnetic Contact coil damaged found. Action Taken: Magnetic contact change.

    Listen to the Message WID599: DTW-121 serial communication problem. Need to check.Continue

  • ACTIVITY

    Field Pump Checking & Maintenance.

    Posted onDecember 3, 2023December 3, 2023

    Checking and maintenance of 2 field pumps completed.

    Listen to the Message Field Pump Checking & Maintenance.Continue

  • Uncategorized

    WID594: Dtw-203 Radio communication error. Need to check.

    Posted onDecember 3, 2023December 3, 2023

    Findings: SCADAPack STAT-LED blinking in Red signal. Action Taken: Restart the SCADAPack & radio modem.

    Listen to the Message WID594: Dtw-203 Radio communication error. Need to check.Continue

  • ACTIVITY

    DTW-218 UPS Output Voltage Showing High.

    Posted onDecember 2, 2023December 2, 2023

    New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.

    Listen to the Message DTW-218 UPS Output Voltage Showing High.Continue

  • ACTIVITY

    IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.

    Posted onDecember 2, 2023December 2, 2023

    IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.

    Listen to the Message IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check.Continue

  • ACTIVITY

    PWID56,DTW120,121,122, 123 RTU & CCTV Panel Clening

    Posted onDecember 2, 2023December 2, 2023

    Listen to the Message PWID56,DTW120,121,122, 123 RTU & CCTV Panel CleningContinue

  • ACTIVITY

    OGR Panel Room AC Cold Air Does Not Come Out.

    Posted onDecember 1, 2023December 1, 2023

    AC Problem solved & Running. The functions of the remote cannot be changed. AC will automatically change after 6 hours. Everything has been…

    Listen to the Message OGR Panel Room AC Cold Air Does Not Come Out.Continue

  • ACTIVITY

    PWID55,DTW114,115,116,117,118 119 RTU & CCTV Panel Clening

    Posted onNovember 29, 2023November 29, 2023

    Listen to the Message PWID55,DTW114,115,116,117,118 119 RTU & CCTV Panel CleningContinue

Page navigation

Previous PagePrevious 1 … 6 7 8 9 10 … 58 Next PageNext

Dhaka Water Supply and Sewerage Authority

+88 01797187749

Join With Us

© 2026 TEAM ICE

  • Home
  • ICE LAB
  • Product Specifications
  • Technical Papers