Similar Posts
DTW223 RTU INSPECTION JOINTLY WITH GKB ENGINEERING LTD
Posted onDTW223 is constructed
WID604: Chlorinator -3 servicing work with Mechanical Team.
Posted onCable connection: Red-RedRed/white-BlackGreen/white-WhiteGreen-GreenBlack- Black/whiteYellow-Yellow/whiteBlue-Green/white
WID601: FIT4002 value is fluctuating too much… which is unusual… need urgent checking.
Posted onFindings: FIT-4002 Ultrasonic sensor Schedule maintenance time over ., Action taken: Plug out both Upstream & Downstream sensor. Clean the sensor & cable…
DTW 116,117,118,119,120,121,122,123 RTU, LIT, PIT, FIT check and maintenance.
Posted onPWID: 74, 75, 76, 77, 78, 79, 80, 81 It’s just a preventive work to avoid upcoming problems of Field Devices & Instruments.
MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
Posted onSL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
DTW-102 Radio Antena Setting
Posted onDTW-102 Radio Antena Setting Done now radio signal normal and stable, DTW is remotely operatable