IRP-1 OGR Electrical Room RTU Panel Preventive Maintenance.
Posted onRTU Panel cleaning completed.
- ACTIVITY | CCTV | DTW | Uncategorized
CCTV maintenance at DTW-109
Posted onIn DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….
MONTHLY PREVENTIVE MAINTENANC SCHEDULE NOVEMBER-2022 (Parvez)
Posted onSL NO. DATE SCHEDULE COMMENTS 01 As per schedule IRP-1 OGR ALL I&C RELATED DEVICES CLEANING. 02 As per schedule IRP-1 SCADA ROOM…
WID651: DTW-219 ACB Tripping coil (opening) chenge.
Posted onFindings: ACB tripped coil ( Opening) didn’t work properly, we change the tripping coil.
Fiber Optical Maintenance
Posted onFiber Optical Maintenance Near DTW-103