Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.

Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.

Findings: Function Generator doesn’t work properly. Action Taken: 1. Physically check the connection 2. Check the pulse signal from SCADAPACK & pulse generator….
The DTW106 has been constructed recently. GKB engineering Ltd. got the electrical and scada integration work. Before handover ICE-Team has been engaged to…
Findings: PIT internal CKT damaged found. Action Taken: Install new pressure transmitter.
Fiber Optical Maintenance Near DTW-103
By ICE Team Trainee: Operation Team A প্রেক্ষাপট বিগত কিছু দিন যাবত দেখা যাচ্ছে, যে স্কাডা থেকে অপারেশন টিমের মেম্বাররা ফিল্ডে গিয়ে কোন…