Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.






Findings: UVR being under voltage, it need a reset to execute Close Command.
Action: ACB open/close command relay check. Isolate the physical reset cable from MC.






Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Connector change IP Setting
There was so much dust SUMMARY যে সকল ডিপটিবলগুলোতে বালুর পরিমান অনেক বেশি এবং তুলনামূলক ঘাস নেই সেই সকল ডিপটিবলের যন্ত্রপাতি গুলো অতি…
Daily Work Plan September 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.09.2022 DTW LIT Sensor installation work. COR DTW Team ICE: ✅PAPPU,…
IRP-2 Server Rack Installation and Optical Fiber Rejoin Done