ACTIVITY | DTW | Jewel | Pappu | Parvez | REPORTS DTW’S PRESSURE INDICATOR TRANSMITTER REPORT Posted onSeptember 24, 2022September 24, 2022 SAVAR-KERANIGANJ WELL FIELD PLANT DTW,S PRESSURE INDICATOR TRANSMITTER REPORT (24.09.2022) DTW NO. VALUE STATUS DTW NO. VALUE STATUS 101 2.3 OK 201 1.9…
ACTIVITY | DTW | MONTHLY REPORTS | Pappu DTW-208 RTU PANEL, VFD CLEANING & CHECKING COMPLETE. Posted onSeptember 6, 2022September 6, 2022
ACTIVITY | CCTV | DTW CCTV Maintenance At DTW-219 Posted onOctober 27, 2022October 27, 2022 1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
ACTIVITY | DAILY REPORTS | MOV | Parvez | Uncategorized WID568: IRP-01 Sand filter MOV-2V07L MOV Opening and closing time Percent value not showing … During the Opening period Directly 0 to 100% showing. Need to check. Posted onNovember 21, 2023November 22, 2023 Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
ACTIVITY | DAILY REPORTS | Parvez | REPORTS Dtw-113 integration with SCADA by Optical Fiber Posted onDecember 1, 2022December 1, 2022
ACTIVITY PWID13:DTW113 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023