Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.

Due to regeneration work, We disconnect the connection of LIT, PIT, FIT.

DTW-116 communication fully error Location: IRP1 Problem Start Date: 6/4/2023 Identified By: Ruhul Amin Solve at: Total Time Required: Total Manpower Deployed: Lead…
General Dhaka WASA adopted Supervisory Control and Data Acquisition (SCADA) system for digitalized handy operation practice for decision making officers, pursuing unmanned operation…
Cable connector pin damage found. Change UTP connector & PoE to ONU short cable.
Findings: Flote Switch mis-displacement problem found. Need to dressing the cable with cable tie.
Findings: FIT-4002 Ultrasonic sensor Schedule maintenance time over ., Action taken: Plug out both Upstream & Downstream sensor. Clean the sensor & cable…