DTW-211 Serial Communication Cable check and Rejoin
Posted onDTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal
- ACTIVITY | DAILY REPORTS | DTW | REPORTS
IRP-1 and IRP-2 Sludge Drying Bed LOP Control Cable Change
Posted onPrevious control cable is damaged by ant .so we replace new control cable
CCTV Maintenance At DTW-219
Posted on1 new camera installation 2. UTP cable change 3. Connector change 4. IP Setting 5. IP Seating
- ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS
DTW-223 5Nos CCTV Maintenance
Posted onONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
CCTV Maintenance At DTW-205
Posted on1.1 Nos New PoE Swich Installation . 2.Cable connector change 3. 5 Nos Camera IP Setup