1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity











1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity











AC Problem solved & Running. The functions of the remote cannot be changed. AC will automatically change after 6 hours. Everything has been…
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
ScadaPack transfer from DTW-207 to 202 Done
IRP-1 /2 Optical Fiber Maintenance Report August-2022 SL No. Location Pole (Nos) Comment 01 Chaira Bridge to DTW101 1 Nos Cable bundle disjoint…
IRP-2 All Dome Camera Lens Cleaning Done
SAVAR-KERANIGANJ WELL FIELD PLANT DTW,S PRESSURE INDICATOR TRANSMITTER REPORT (24.09.2022) DTW NO. VALUE STATUS DTW NO. VALUE STATUS 101 2.3 OK 201 1.9…