1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity











1.5Nos new camera installation
2.1Nos New PoE Switch Installation
3.1Nos New Onu Installation
4.CCTV Server Panel Installation
5.Optical Fiver Connectivity











To solve this problem, we increase the height 1 meter more and change the direction.
SAVAR-KERANIGANJ WELL FIELD PLANT DTW,S PRESSURE INDICATOR TRANSMITTER REPORT (24.09.2022) DTW NO. VALUE STATUS DTW NO. VALUE STATUS 101 2.3 OK 201 1.9…
DTW-106 CCTV Base Placement Done
SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…
Issue Forward to the electrical team.