1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done





1.DTW-103 New VFD Controller Install
2. Parameter set
3.Serial Communication Cable Wiring Work Done





FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…
Problem: OGR Booster pump E running time Moter current high (682 Amp) showing than pump stop that time frequency is 0.3 Hz (Abnormal).Problem…
DTW-101,102,103,104,107,109,110,111,209,206,207,205,208,203,201 Camera Lens Cleaning Done There are too much dust accumulate on the camera lens and the video footage isn’t clear to understand.
IRP-2 Sub-Station 1Nos New Server Rack Installation Done
To solve this problem, we increase the height 1 meter more and change the direction.
IRP-1 Office Building 1 Nos New Camera Install For Security Purpose