Breaker installation for SCADA control Room Monitor Done





Breaker installation for SCADA control Room Monitor Done





1. connector change 2. IP Setup
DTW-104,105,106,107 Cleaning Done
IRP-2 Sand Filter All Ultrasonic Sensor Cleaning Complete.
26.11.2023 Today SEL manpower change the e-PRV CRD spring. And we check the e-PRV functionality is okay or not okay. MOV-1 50% Open,…
In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….
Problem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…