Breaker installation for SCADA control Room Monitor Done





Breaker installation for SCADA control Room Monitor Done





PIT Interlock
problem found: IRP-1 Backwash holding tank -A pump’s cable terminal box gets short circuit & burn. For instance, a fault signal came in…
SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…
when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
DTW-113 Scada Pack Programing And Install Done