Breaker installation for SCADA control Room Monitor Done





Breaker installation for SCADA control Room Monitor Done





Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
In DTW-117, there are 2 Nos maintenance and installation : 1. Optical fiber rearrangement. 2. 2 Nos new camera install. 3. 44 meter…
Optical Fiber Maintenance For DTW- 114,115,117,118,119,120,121,122,123 The Optical Fiber Cable is Burn By REB Cable short Circuit, That’s why we change New 611…
1.Camera IP reset 2.New IP install
IRP-1 All sandfilter ultrasonic sensor cleaning Done. There was so much dust