In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this DTW was out of our security system.














In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this DTW was out of our security system.














ONU connection Problem . Now DTW-223 5 Nos CCTV operation in NAV-4
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
Problem: Do not show footage in NAV.Problem found: ONU & 1 Nos cc camera Problem found.
IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.