In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this DTW was out of our security system.













In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this DTW was out of our security system.













Due To Strom the optical fiber cable fall down and damage near DTW-209 to 206 Now Everything is Normal
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little…
Problem: When the pump is stopped and normally shuts off, a fault automatically occurs in the MOV (4P01-E). In this case the valve…