Previous ONU frequently becomes unstable/hang. So replace the ONU.


Previous ONU frequently becomes unstable/hang. So replace the ONU.


IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.
In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….
In the time of Civil work the contractor’s people cuts down the fiber cable to conduct their civil work. As a result this…