ACTIVITY | DAILY REPORTS | Pappu | REPORTSIRP-2 ALL LOP Panel Cleaning
Posted onThere was so much dust
IRP-1 DTW RTU,VFD & CCTV Panel Cleaning
Posted onDtw 101,102,103,109,110 RTU panel , VFD internal site & CCTV panel cleaning complete .
ACTIVITY | DAILY REPORTS | Jewel | Pappu | ParvezInstrumentation Findings of Month (October,2022)
Posted onDaily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
ACTIVITY | DAILY REPORTS | DTW | PappuDTW 117 PIT Checking and maintenance complete.
Posted onProblem: PIT value does not showing in the SCADA & field device.Problem found: PIT 24v AC supply fuse damage found & maintenance. now…
- ACTIVITY | DTW | MONTHLY REPORTS | Pappu
DTW-203 RTU, VFD CLEANING & CHECKING COMPLETE.
Posted on 1 x 4 PLC Fiber Splitter, Steel Tube, Bare Fiber 250μm, No Connector, Singlemode
Posted onSpecification SL No Specification criteria Specifications 1 Model PLC-104-ST-25-15 2 Configuration Type Configuration Type 3 Package Style Steel Tube, Bare Fiber 4 Fiber…