Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,









Pages: 1 2
Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,









1.one new camera installation 2. Connector Change 3.IP Setup
To solve this problem, we increase the height 1 meter more and change the direction.
Optical Fiber Network Status October 2022 SL NO. Location In Between DTW Near Pole No Lat/Long Affected Location Remarks 01 Baherchor to Bottoli…
Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷
1 :MW03B 2: MW14A 3:MW08A 4: MW13B
1.UTP Cable Change 2.Connector Change 3.IP Setup