1.UTP Cable Change 2.Connector Change 3.IP Setup




1.UTP Cable Change 2.Connector Change 3.IP Setup




IRP-1 Sand Filter FCP Panel Cleaning Done
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
IRP-1. CC Camera Server Panel Cleaning Done
Problem: after power up time ACB do not close from the SCADA command.Problem found: 27X M/C Magnetic Contact & AUX CONTACT UNIT Problem…
1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang