1.UTP Cable Change 2.Connector Change 3.IP Setup




1.UTP Cable Change 2.Connector Change 3.IP Setup




when we install new VFD controller , the HMI Graph do not change from scada that time . so we reinstall old VFD…
Breaker installation for SCADA control Room Monitor Done
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
Dtw 111 LIT Reinstallation complete . DTW 111 থেকে পুরাতন একটি LIT স্টোরে জমা দেয়া হয়েছে ৷
DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING COMPLETE There was so much dust