Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU








Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU








IRP-1. CC Camera Server Panel Cleaning Done
Specification SL No Specification criteria Specifications 1 Brand Name Usha Martin 2 Model 12 3 Diameter 6 mm 4 Type Single Mode 5…
In DTW-104, the optical fiber is broken by lizard in TJ box. We rejoin the optical fiber. Now CCTV can be seen in…
1.Cable connector change 2. IP Setup
Finding: MOV 2V07-L opening & closing time percentage isn’t showing properly in SCADA & Field side. Action Taken: Reset the MOV-2V07.
New UPS installed at DTW-218 and old UPS brought to plant for problem checking. Now the pump is running and everything is normal.