Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU








Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU








Observation: DTW 201 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 201, We checked up to 10 minutes. In…
106,117,118 এবং 223 এই DTW গুলো তে আগে পাওয়ার চলে গেলে ফল্ট ধরে রাখত যার কারণে অপরেশন টিম থেকে লোক পাঠিয়ে এটা রিসেট…
SCADAPACK Report October 2022 SL NO. DTW NO. Repaired History include Date Remarks 01 101 ✅ 02 102 ✅ 03 103 ✅ 04…
There was a damaged LIT. After regeneration work we have install a new LIT
1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang
IRP-1 Office Building 1 Nos New Camera Install For Security Purpose