ACTIVITY PWID27:DTW204 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check. Posted onDecember 2, 2023December 2, 2023 IRP#01 Main substation, Electrical Panel Room, OGR Electrical Panel Room Cleaning & Visual Check Work Completed.
ACTIVITY | DAILY REPORTS | DTW | REPORTS IRP-2 Server Rack Installation and Optical Fiber Rejoin Posted onNovember 17, 2022November 17, 2022 IRP-2 Server Rack Installation and Optical Fiber Rejoin Done
ACTIVITY | DAILY REPORTS New parameter setting on an old ultrasonic level transmitter. Posted onSeptember 28, 2022September 28, 2022
ACTIVITY PWID33:DTW210 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | CCTV | DTW CCTV Maintenance At DTW-120 Posted onOctober 27, 2022October 27, 2022 Connector change IP Setting