ACTIVITY Material Inspection of IRP-1 & IRP-2 Radio communication establishment. Posted onSeptember 12, 2022September 13, 2022
ACTIVITY PWID31:DTW208 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | DTW DTW-122 Modbus Interrupt problem maintenance Posted onSeptember 24, 2022September 24, 2022 The modbus serial communication cable is cut by mouse. The cable reconnect & solve the problem.
ACTIVITY PWID29:DTW206 Bullet camera glass and cage cleaning. Posted onNovember 16, 2023November 16, 2023
ACTIVITY | CCTV | DAILY REPORTS | DTW | REPORTS DTW-201,202,203,206,208,209,210,211 CCTV Maintenance Posted onDecember 11, 2022December 11, 2022 1.Camera IP reset 2.New IP install
ACTIVITY | DAILY REPORTS | REPORTS IRP-1 All Doom Camera Lens & Camera Panel Cleaning Posted onNovember 29, 2022November 29, 2022 IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust