DTW-113 Scada Pack Programing And Install Done




DTW-113 Scada Pack Programing And Install Done




IRP-1 Office Building 1 Nos New Camera Install For Security Purpose
Problem: Shutdown time is ACB not open.Problem found: ACB Internal control unit not working found.Observation: DTW 203 UVR checked, When plug PTT UVR…
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU
Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
DTW-102 Scada Pack Programing And Install Done
Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,