IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little weak found but workable) Now Normal





IRP-1 SDB Additional Dewatering Pump check: 1. Motor winding Resistance check (Normal) 2. Motor Ampere check (Normal) 3. MC coil check ( little weak found but workable) Now Normal





DTW-113 Scada Pack Programing And Install Done
problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.
Specification SL No Specification criteria Specifications 1 Length of Tube 60mm 2 Inner Tube Diameter Inner 1.5mmOuter 2.2mm 3 After Recover Diameter 3mm…
Cleaning Status: Completed. Findings: No problem found.