Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










There was a damaged LIT. After regeneration work we have install a new LIT
Problem: Do not show footage in NAV.Problem found: Optical Network Unit (ONU) problem & 2 nos cc camera damage found and New ONU installing. Now…
Radio Communication problem solve and there are graphical problem in SCADA DTW 107 radio comm. checking complete.গত ৩১/১০/২০২২ তারিখ বিকাল 06:18 pm এর…
Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…
IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…