Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Findings: UVR being under voltage, it need a reset to execute Close Command. Action: ACB open/close command relay check. Isolate the physical reset…
In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….
DTW-120 PIT maintenance Done. Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada LIT Do Not Down in…
Serial No Description Unit Quantity 1 LILIN Bullet Camera Nos 08 2 LILIN Dome Camera Nos 02 3 CCTV Panel Nos 02 4…
1.1 Nos New Camera Installation . 2. IP Setup