Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Findings: Lots of hanging TJ box is visiable.
Action Taken: Reduce TJ box replacing optical fiber.










Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
DTW#217,216,209 VFD RTU AND CCTV PANEL CLEANING COMPLETE There was so much dust
Unused LIT Collect from DTW- 221,207,120,123 Done
In DTW-109, there are 4 Nos maintenance and installation : 1 Nos new PoE switch install. 2. 3 Nos new camera install. 3….
1.1 Nos New Camera Installation . 2. connector change 3. IP Setup
Problem: after power up time ACB do not close from the SCADA command.Problem found: 27X M/C Magnetic Contact & AUX CONTACT UNIT Problem…