Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Specification SL No Specification criteria Specifications 1 Model PLC-104-ST-25-15 2 Configuration Type Configuration Type 3 Package Style Steel Tube, Bare Fiber 4 Fiber…
1.Camera IP reset 2.New IP install
VFD Report November 2022 SL NO. DTW NO. Controller Status VFD Status Serial Communication Remarks 01 101 OK OK ✅OK 02 102 OK…
Sl No. Date Location Task Name Work update Remarks 2 9/3/2022 33 KV interlink HT Network visual checking & Monthly tree trimming work….
IRP-1 360° Dome camera lens cleaning done. All panel brush to reduce dust. There was so much dust