Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
Unable to take LIT, due to keep heavy machinery in DTW compound.
We collect Electronic PIT, Manual Pressure Gauge. And disconnect power supply of LIT,PIT,FIT.




25.11.2023 today I collect the LIT from DTW-113
1.Cable connector change 2. IP Setup
problem found: SCADA Pack Fuse & Radio Device (Trio JR240) Fuse is burn.
To solve this problem, we increase the height 1 meter more and change the direction.
DTW-211 CCTV power is taken from main ups. Do not get sufficient backup from ups and frequently fault occurs.
ScadaPack transfer from DTW-207 to 202 Done
Checking and maintenance of 2 field pumps completed.