1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang


1.1 NOS new Camera installing 2.UTP Cable Change 3. Connector Chang


Findings: FIT-4002 Ultrasonic sensor Schedule maintenance time over ., Action taken: Plug out both Upstream & Downstream sensor. Clean the sensor & cable…
Optical fibber connection, CCTV PoE Switch Onu Inter connection, 5 NOS camera add in Nav-4,
DTW-120 CCTV Maintenance There was connector Problem. Now DTW-120 (5 nos ) camera operation in NAV-2
ICE ISSUES SL No Work ID Date Description Status Remarks / Log 78 243 6/4/2023 (NEW)DTW-116 communication fully error.now it’s locally running pending…