1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup



1.1Nos New Camera Installation 2. UTP Cable Change 3. Connector Change 4. IP setup



IRP-2 Sub-Station 1Nos New Server Rack Installation Done
IRP 2 FCP ক্লিনিং কাজ সম্পন্য হয়
Problem: In those sensors, high temperature shows in transmitter display. But when we check the mA current of sensor signal, that was OK….
IRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
DTW-211 Serial Communication Cable check and Rejoin Done. Now communication normal
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal