PIT Interlock
Similar Posts
Daily Work List July 2022
Posted onWID550: DTW-207 optical fiber maintenance.
Posted onFindings: Lots of hanging TJ box is visiable. Action Taken: Reduce TJ box replacing optical fiber.
- ACTIVITY | DAILY REPORTS | DTW | REPORTS
DTW-122 Grass plantation
Posted onThere is so much dust so we Plant grass to prevent road side dust
- ACTIVITY | DAILY REPORTS | DTW | REPORTS
IRP-2 RTU & VFD Panel Cleaning
Posted onIRP-2 RTU Panel, Server Panel & VFD Panel Cleaning Done
DTW- 123 CCTV Maintenance
Posted onDTW-117 & 118 UVR Related M/C checking.
Posted onProblem: after power up time ACB do not close from the SCADA command. Problem found: 27X Magnetic Contact (M/C) & AUX Contact Unit…
