DTW-120 PIT maintenance Done.
Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada
LIT Do Not Down in The Boring After 7 Meter









DTW-120 PIT maintenance Done.
Rearrange cable waring. fuse change.now PIT is ok and give proper value in scada
LIT Do Not Down in The Boring After 7 Meter









Observation: DTW 107 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 107, We checked up to 10 minutes. In…
FIT Status October 2022 SL NO. DTW Field Value SCADA Value Remarks 01 101 198 m3/h 192 m3/h ✅OK 02 102 174 m3/h…
IRP-1 All LOP Panel Cleaning Done
Fiber Optical Maintenance Near DTW-103