IRP-1 All LOP Panel Cleaning Done









IRP-1 All LOP Panel Cleaning Done









Previous ONU frequently becomes unstable/hang. So replace the ONU.
Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
1.1 Nos New Camera Installation . 2. IP Setup
Specification SL No Specification criteria Specifications 1 Model PLC-104-ST-25-15 2 Configuration Type Configuration Type 3 Package Style Steel Tube, Bare Fiber 4 Fiber…
CCTV Pool adjustments 1 new camera installation 1 new PoE Switch installation UTP cable change IP Setting
In DTW-103, there are 3 Nos maintenance and installation : 1. IP configure in CCTV camera. 2. 2 Nos new camera install. 3….