Installation and Commissioning of the vacuum circuit breaker is relatively simple, and it is a process that must be completed before leaving the…
1.Cable connector change 2. IP Setup
To solve this problem, we increase the height 1 meter more and change the direction.
Due To Strom the optical fiber cable fall down near DTW-114 to 117 and chaira brize to DTW-218 now everything is normal
Flexible pipe lay down,LIT Cable Enter intu Flexible pipe from Boring to RTU