IRP-1 All sandfilter ultrasonic sensor cleaning Done.
There was so much dust



IRP-1 All sandfilter ultrasonic sensor cleaning Done.
There was so much dust



IRP- 2 1nos CC Camera Maintenance done, there was connector problem. now IRP-2 Sub-Station all CC Camera in operation.
Modbus Serial communication cable check Complete. No problem Found in the Field LIT Do Not Down in The Boring After 10 Meter
1.Cable connector change 2. IP Setup
1.Cable connector change 2. IP Setup