ACTIVITY | DAILY REPORTS New parameter setting on an old ultrasonic level transmitter. Posted onSeptember 28, 2022September 28, 2022
ACTIVITY | DAILY REPORTS | Pending Issue IRP1 Sludge drying bed float switch checking. Posted onSeptember 15, 2022October 12, 2022 Problem found: Sludge bed চেম্বারে কাদার পরিমান বেশি হওয়ার কারনে ৷ LoLo সিগনালের ফ্লোট সুইচটি কাদার মধ্যে অাটকে যাচ্ছে ৷তাই স্কাডাতে HiHiLoLo সিগনাল…
ACTIVITY | DAILY REPORTS | DTW | NETWORK CONNECTIVITY | Pending Issue DTW -118 Radio Communication checking complete. Posted onOctober 6, 2022October 12, 2022 Observation: DTW 118 Radio Communication checking complete. This DTWs communication is very bad.1. In DTW 118, We checked up to 10 minutes. RSSI…
ACTIVITY | DAILY REPORTS | DTW | REPORTS PIT Installation Posted onNovember 11, 2022November 11, 2022 DTW-205 1Nos New PIT Installation Done DTW-211 1Nos New PIT Installation Done DTW-104 1Nos Old PIT Installation Done
ACTIVITY | DAILY REPORTS | DTW Unused & damage LIT sensor collects complete from DTW 105,106,115,203 & 212 Posted onOctober 10, 2022October 10, 2022 Unused & damage LIT sensor collects complete from DTW 105 – 1 nos DTW 106 – 1 nos & new lit sensor install.DTW…
ACTIVITY | DAILY REPORTS Instrumentation Findings of Month (October,2022) Posted onOctober 4, 2022October 24, 2022 Daily Work Plan October 2022🠗 SL/NO Date PROBLEMS TYPE LOCATION REMARK 1 01.10.2022 DTW-105 CCTV checking maintenance. COR CCTV Team ICE: ✅PAPPU, Parvez,…
Thank you for the appreciation, we are trying to do the best